The customer's new workshop has a total of 5 production lines, the capacity of the mill is 2 sets of 500 kg/h + 2 sets of 300 kg/h + 1 set of 700 kg/h, and 5 sets of Kingfit one-to-one powder cooler dryer sets are selected, and the materials from the mill can be directly packaged and sealed in the box.